Design Implementation
A drawing is not a guarantee something can be built. In the fabrication industry, designs frequently arrive specifying material grades that do not exist in the market, components at sizes that cannot be cut on any laser bed, or dimensions that look correct on paper but create problems the moment steel is involved. For a fabricator working to BS EN 1090 EXC2, manufacturing to a non-compliant specification is not an option — the accreditation requires full material traceability and grade compliance. Making something wrong to meet a deadline is not a solution.
Design implementation is the service we provide when customers, architects, or construction companies hand us their drawings and ask us to manufacture to specification. The drawings come in as PDFs, DWG files, paper drawings, or rough sketches. Our first job is not to start cutting steel — it is to review those designs with a fabricator’s eye, identify anything that cannot be made as drawn, and agree a workable solution before anything goes near the workshop. We have never had to turn down a design implementation project. But we have put plenty of jobs on hold until the design was revised into something that could be made.
Enquire Here
What Design Implementation Covers
We manufacture from designs provided by customers, architects, or construction companies. The scope can range from straightforward beams with basic dimensions to complex mezzanine floors and staircases requiring full fabrication drawing packs and structural calculations.
- Manufacture from PDF, DWG, paper drawings, or rough sketches
- Manufacturability review before any work is committed — materials, grades, and machinery constraints all checked
- Material grade verification for BS EN 1090 EXC2 compliance — non-existent or non-compliant grades identified and substituted with client approval
- Site surveys where existing steelwork or structural connections are not visible on drawings
- Structural calculations via a trusted external structural engineer where required
- Full quality checks at every stage — dimensions, hole positions, plate positions, weld quality — all checked against fabrication drawings
- Test build before coatings on applicable jobs
- Red primer or specified finish applied before dispatch
- Final inspection before delivery
“We get involved at various stages and make recommendations on how things can be made with the materials and machinery that is available.”
The Manufacturability Review
The majority of fabricators will take drawings and manufacture to specification. If the specification is wrong, that becomes apparent when something does not fit, does not comply, or cannot be made — usually at a point that costs money to fix.
We review designs before fabrication starts. If there is a problem, we flag it immediately: a screenshot goes to the client showing exactly where the issue is, followed by a call to explain it and agree the solution. The job is formally put on hold until the client has approved any changes. Nothing proceeds without that sign-off.
The problems we catch fall into a few categories. Material grade errors are common — designers sometimes specify grades that do not exist as stock, or copy-paste specifications from previous jobs without checking what is available in the current market. We identify the correct available grade, advise the client, and raise a formal concession before we change anything. Machinery constraints are another: our laser cutting bed handles up to 2,990mm. A component drawn at five metres cannot be cut in one piece. We advise the client it needs to be produced in sections and joined — solving the problem rather than turning the work away. And occasionally, the design itself has structural gaps — if a beam has not been structurally calculated, we will flag it before we make it.
“A lot of jobs that we get in are drawn by people who have no knowledge of how to manufacture.”
“They specify grades that don’t exist. They just copy and paste and get lazy — then we have to recommend the materials that are available, otherwise it would be infringing on our EN 1090.”
This review process protects the client’s project and our own accreditation. Under BS EN 1090 EXC2, manufacturing to a non-compliant material grade is not a minor procedural issue — it puts the structural integrity and certification of the finished component in question. Catching the error on screen costs nothing. Finding it in fabricated steel, or on site, costs considerably more.
How Design Implementation Works
| Step 1 | You send us your designs — PDF, DWG, paper drawings, or rough sketches. Simple jobs with basic dimensions can proceed from a sketch. Complex work such as staircases or mezzanine floors requires full fabrication drawings. |
| Step 2 | We review the designs for manufacturability: can this be made with available materials and machinery? Material grades are checked for compliance with BS EN 1090 EXC2. Physical constraints such as laser cutting bed size are assessed. |
| Step 3 | Any problems are flagged immediately. A screenshot is sent showing exactly where the issue is, followed by a phone call to explain it and agree the solution. Simple jobs, simple formats — no lengthy written reports. |
| Step 4 | The client formally approves any changes or concessions before work proceeds. The job is held until that approval is received. Nothing is manufactured to an unapproved specification. |
| Step 5 | If the project requires it, a site survey is carried out to gather information that drawings cannot show — for example, existing steelwork that is boxed in and not visible until panels are removed. |
| Step 6 | Where structural calculations are required, an initial layout design is produced and sent to a trusted external structural engineer. The client approves the final design once calculations are complete. |
| Step 7 | Full fabrication drawings are produced and the job goes to the workshop. Every stage is checked against drawings — dimensions, hole positions, plate positions, weld quality — before and after welding. |
| Step 8 | A test build is carried out before any coatings are applied. Red primer or specified finish is applied, a final inspection is completed, and the job is dispatched. |
Project Examples
Mezzanine Floor Extension — Car Dealership
Challenge: Existing steelwork not visible on drawings — required site survey including removal of boxing-in panels.
Total time: Six to eight weeks (four to five possible with faster client approvals).
The client needed to extend an existing mezzanine floor. Initial overview drawings were provided with overall dimensions. After winning the work, Ian carried out a full site survey — which involved removing boxing-in panels to reveal the existing steelwork the new structure would connect to, as it was not visible on the drawings. An initial layout design was then produced, submitted to a structural engineer for calculations, and sent to the client for approval. Once signed off, full fabrication drawings were produced. The mezzanine was test built before coatings, red primed, inspected, and dispatched. Total time was six to eight weeks, with four to five weeks achievable had client approvals come through more quickly.
Landing Plate — Specified Size Does Not Exist
Solution: Client advised, design revised to split and join mechanically.
Status: Job held until revised design approved.
A landing plate arrived drawn at a size that does not exist as a standard stock plate. Rather than manufacture something non-compliant or source a workaround without telling the client, we advised them that the specified size was unavailable and that the only practical option was to split the plate and join it mechanically. The job was formally put on hold while the client revised the design. Once the revised specification was approved, the job could proceed to manufacture.
“We had to advise the sizes that we could change to — it had to be made in two halves and joined.”
“The job is put on hold until that design is revised into a size that can be made.”
Cat Ladders — Laser Bed Limitation
Problem: Laser cutting bed maximum is 2,990mm.
Solution: Produced in sections and joined — job completed, not turned away.
The designer drew five-metre cat ladders as single continuous sections. Our laser cutting bed handles up to 2,990mm — a five-metre ladder cannot be cut in one piece. We advised the client that the ladders needed to be produced in sections and mechanically joined. This is a common constraint that other fabricators may use as a reason to decline the work. We use it as a reason to advise the client on the correct specification and get on with manufacturing. The ladders were produced in sections, joined to specification, and delivered.
Capabilities
Designs accepted |
PDF, DWG, paper drawings, rough sketches |
Laser cutting bed capacity |
Up to 2,990mm — longer components split and mechanically joined |
Material grades |
Verified for BS EN 1090 EXC2 compliance before manufacture — non-compliant grades identified and formally substituted |
Structural calculations |
Handled via trusted external structural engineer where required |
Quality checks |
Dimensions, hole positions, plate positions, weld quality — checked against fabrication drawings before and after welding |
Test build |
Carried out before coatings on applicable jobs |
Typical turnaround |
4 to 5 weeks once designs are approved and signed off. Can extend to 6 to 8 weeks depending on client response times for approvals. |
Finishes |
Red primer or client-specified finish applied before dispatch |
Concession process |
All design changes formally approved by client before proceeding — nothing manufactured to an unapproved specification |
BS EN 1090 EXC2 |
Full material traceability on all work — Cert No: 20203, Exc Class 2 |
FAQ’s
-
We will need to see them first, but we have never had to turn a project down. If something cannot be made exactly as drawn, we will tell you what needs to change and give you the solution. Send us what you have and we will review it.
-
A basic sketch will get you started. The more detail you include — dimensions, material spec, finish, location of fixings — the more accurate the quote. Full drawings give us the most accurate price.
-
Typically four to five weeks once designs are approved and signed off. Some jobs run to six to eight weeks, but that is usually down to waiting on client approvals rather than manufacturing time. The manufacturing portion is predictable — the approval chain is not always within our control.
-
That is normal. We review every set of drawings before manufacturing begins and flag any issues early. We send screenshots showing exactly what the problem is, then follow up with a call. We would rather flag it before we cut steel than discover it afterwards.
-
We identify the correct available grade, advise you, and raise a formal concession for your approval before we change anything. Nothing is substituted without your sign-off. This protects both your project and our BS EN 1090 EXC2 compliance.
-
Our laser cutting bed handles up to 2,990mm. For longer components, we advise producing them in sections and joining mechanically. This is a practical solution we use regularly — it does not mean the job cannot be done.
-
No. Where calculations are required, we work with a trusted external structural engineer and manage that process for you.